WAPA will replace their structures and line hardware for phase 1 of the Fargo to Grand Forks Life Extension. Structures to be replaced on the Fargo…
Office of NEPA Policy and Compliance
July 28, 2026WAPA will replace their structures and line hardware for phase 1 of the Fargo to Grand Forks Life Extension. Structures to be replaced on the Fargo-Grand Forks line are 0/1-0/3, 2/7-3/2, 18/3-19/6, 31/6-43/6, 58/7, 62/1, 65/1. The project will include wood structure replacements, wood crossarm(s) replacements, steel bedrail installation, insulator replacement, and anchor installation.