CX-036074: Newport Utilities Substation Upgrade Project

To strengthen grid durability and operational flexibility, Newport Utilities (NU) proposes the following activities. Feeder Circuit Construction (C…

Office of NEPA Policy and Compliance

July 16, 2026
Estimated Read Time   min

To strengthen grid durability and operational flexibility, Newport Utilities (NU) proposes the following activities. Feeder Circuit Construction (Cocke, Sevier, Jefferson Counties): Construct two new 13kV double-circuit feeders along Industrial Road (approx. 3.63 miles) and Chemwood Drive (approx. 1.04 miles) to diversify load distribution and reduce reliance on single radial feeds. Install associated poles, framing, and conductors to enable rerouting of power during faults or maintenance, improving service continuity for critical facilities such as hospitals, schools, and water treatment plants.