Replacement/reframing of old standard overhead transformer stations (101), removal of open wire secondary (60,000 ft), installation of additional o…
Office of NEPA Policy and Compliance
July 16, 2026Replacement/reframing of old standard overhead transformer stations (101), removal of open wire secondary (60,000 ft), installation of additional overhead transformer stations (200), and replacement of 301 existing wooden poles with new class 1 (15) and class 3 (286) poles.