CX-036027: Bridgeport-Gering 115-kV Transmission Line Structure Removal and Replacements

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove existing Structure 484 and replace existing Structures 48…

Office of NEPA Policy and Compliance

June 30, 2026
Estimated Read Time   min

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove existing Structure 484 and replace existing Structures 483A and 484A on the Bridgeport-Gering 115-kV Transmission Line in Scotts Bluff County, Nebraska. The purpose of the proposed action is to replace structures that have been identified as structurally deficient and remove a structure that is no longer required following the replacements.