CX-036017: 34.5kV Mission Corridor Redundant Power Upgrade

The proposed action is the installation of approximately 3 miles of 34.5kV power lines along the east side of the 05-01 Road in Area 5 of the NNSS.…

Office of NEPA Policy and Compliance

May 7, 2026
Estimated Read Time   min

The proposed action is the installation of approximately 3 miles of 34.5kV power lines along the east side of the 05-01 Road in Area 5 of the NNSS. The power line would begin approximately 3,600 feet north of the 05-01 and 05-03 intersection (Pole Number: DDP-59-15) and terminate at the Radioactive Waste Management Complex (RWMC).