The subcontractor will perform roof retrofit on 719-5N. The Subcontractor "will" disturb the existing roof while performing retrofit on 719-5N.…
Office of NEPA Policy and Compliance
June 8, 2026The subcontractor will perform roof retrofit on 719-5N. The Subcontractor "will" disturb the existing roof while performing retrofit on 719-5N.