CX-035711: Temporary Modification C-TMOD-Z-00004 Move the Saltstone Hopper Overflow Container (SHOC) and Modify Process Vessel Ventilation (PVV) Line due to Incorrect Port Locations

Temporary modification to move the Saltstone Hopper Overflow Container (SHOC) to align the ports by installing a temporary duct line to connect the…

Office of NEPA Policy and Compliance

April 16, 2026
Estimated Read Time   min

Temporary modification to move the Saltstone Hopper Overflow Container (SHOC) to align the ports by installing a temporary duct line to connect the SHOC to the Process Vessel Ventilation (PVV) Line, which will also require rerouting of tubing and repositioning one piping support.