The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.
Office of NEPA Policy and Compliance
October 8, 2025The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast. The existing overhead telephone line would be removed and its replacement is optional.