Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc. Replace Door No. 3 and remove door No. 4…
Office of NEPA Policy and Compliance
December 2, 2025Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc. Replace Door No. 3 and remove door No. 4.