CX-035110: Reinstall Real-Time Radiography 2 Trailer

The Real-Time Radiography 2 (RTR-2) Trailer will be transferred to Waste Control Specialists (WCS) out of Texas. It will potentially be sent to add…

Office of NEPA Policy and Compliance

December 3, 2025
minute read time

The Real-Time Radiography 2 (RTR-2) Trailer will be transferred to Waste Control Specialists (WCS) out of Texas. It will potentially be sent to additional contractors for maintenance if needed. The RTR-2 Trailer will ultimately be returned to Savanah River Site (SRS). Revision 1: Due to potential integrity concerns, RTR-2 will be staying at SRS and will be reinstalled in place.