The 105-C roof is leaking on 26 elevation between the CMA (Crane Maintenance Area) and Purification Areas. Rainwater is getting into the waste and…
Office of NEPA Policy and Compliance
December 15, 2025The 105-C roof is leaking on +26 elevation between the CMA (Crane Maintenance Area) and Purification Areas. Rainwater is getting into the waste and lead storage areas, therefore repair work is needed.