The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Office of NEPA Policy and Compliance
September 10, 2025The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam to vessels 6.8E and 7.7E would provide an extra engineering control to prevent inadvertently overflowing.