- On September 6, 2020, a 202(c) emergency order was issued to the California Independent System Operator (CAISO) authorizing specific electric generating units located within the CAISO balancing authority area to operate at their maximum generation output levels due to an ongoing “Extreme Heat Event” and to preserve the reliability of bulk electric power system.
- On August 27, 2020, a 202(c) emergency order was issued authorizing and directing CenterPoint Energy Houston Electric (CEHE) to operate an existing, permanent tie-line to assist in electricity restoration of power to Entergy Texas, Inc. and electric cooperatives and municipal customers within the State of Texas as a result of Hurricane Laura making landfall near the Texas-Louisiana border.