- On September 10, 2021, the DOE issued a 202(c) emergency order pursuant to the Federal Power Act to the California Independent System Operator Corporation (CAISO) authorizing specific electric generating units located within its service territory to operate at their maximum generation output levels in order to preserve the reliability of the bulk electric power system due to ongoing wildfires, extreme heat, and droughts causing a diminished ability to generate hydropower resulting in higher than usual electricity demand.
- On February 14, 2021, a 202(c) emergency order was issued to the Electric Reliability Council of Texas (ERCOT) authorizing specific electric generating units (resource list) located within the ERCOT area to operate at their maximum generation output levels due to ongoing extreme weather conditions and to preserve the reliability of bulk electric power system.