CX-034209: Survey of 235-F Second Floor Exhaust Ductwork

The proposed activity is for Radiological Protection Department to perform a radiological survey of the building 235-F second floor exhaust ductwor…

Office of NEPA Policy and Compliance

July 7, 2025
minute read time

The proposed activity is for Radiological Protection Department to perform a radiological survey of the building 235-F second floor exhaust ductwork located on the facility roof.