CX-033981: Repair Sheetrock 702-F

Repair of the South and West sheetrock in room No. 2 and all sheetrock in room No. 3 in building No. 702-F. This includes: replacing cove base, pat…

Office of NEPA Policy and Compliance

May 7, 2025
minute read time

Repair of the South and West sheetrock in room No. 2 and all sheetrock in room No. 3 in building No. 702-F. This includes: replacing cove base, patching, prepping, and painting sheetrock, replacing door stop, replacing light switch plate, prepping and painting existing door and door frame.