The reason for the change is due to the existing 3/4" blowdown being used to release water from the cooling tower basin being undersized for its in…
Office of NEPA Policy and Compliance
February 5, 2025The reason for the change is due to the existing 3/4" blowdown being used to release water from the cooling tower basin being undersized for its intended purpose. Introducing a larger diameter pipe with a motor operated valve and control panel input will allow for more flow and less manual valve operation. Per POC released water from the basin goes to A-01 Outfall.