The purpose of revision is to add the Co-electrolysis project and to add a Second 50kw SOEC system to ESL backyard. Along with the addition of the …
Office of NEPA Policy and Compliance
September 18, 2024The purpose of revision is to add the Co-electrolysis project and to add a Second 50kw SOEC system to ESL backyard. Along with the addition of the supporting modular structure for equipment.