The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G and three (3) different a…
Office of NEPA Policy and Compliance
September 12, 2024The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G and three (3) different asphalt core samples taken at random location along Stores side road in A-Area that runs parallel to D-Road.