CX-030553: Lane-Wendson No. 2 Structures 21/3 to 22/3 Line Repair Project

Bonneville Power Administration (BPA) proposes to construct two landings on existing access roads to rebuild the top half of structure 22/2 on the …

Office of NEPA Policy and Compliance

April 11, 2024
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to construct two landings on existing access roads to rebuild the top half of structure 22/2 on the Lane-Wendson No. 2 transmission line.