CX-027413: 713-2N Fabricate and Replace Guardrails on Dock

Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require …

Office of NEPA Policy and Compliance

December 15, 2022
Estimated Read Time   min

Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require repair from erosion.