CX-020299: 2019 Schultz-Raver No. 1 Goat Peak Repair Project

The Bonneville Power Administration (BPA) proposes to repair damaged goat peaks on structures 61/3, 61/4, 61/5 along the Schultz-Raver No. 1 500 kV…

Office of NEPA Policy and Compliance

July 3, 2019
minute read time

The Bonneville Power Administration (BPA) proposes to repair damaged goat peaks on structures 61/3, 61/4, 61/5 along the Schultz-Raver No. 1 500 kV (kilovolts) transmission line. All repairs would be done via helicopter. No ground disturbance to include new roads or landings would be necessary. An existing landing would be utilized for the helicopter landing zone.