Summary
Bonneville Power Administration prepared an EA that evaluates the potential environmental impacts of a proposal to rebuild the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.