This new CX determination has been signed due to the addition of installation locations/charging stations.…
Installation of battery energy storage systems of various sizes at sites in Minneapolis, MN.…
ACSR or No. 1/0 ACSR Tree Wire phase conductors and No. 1/0 ACSR neutral conductors. …
Western Area Power Administration (WAPA) has determined that the existing 2.07-acre Moorhead Microwave property and microwave tower are no longer n…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Niron Magnetics, Inc (Niron) to design, fabricate, assemble, and tes…
The project includes rebuilding 7.6 miles of single-phase overhead line to underground to increase the reliability and resiliency of electric servi…
The project would rebuild 12.6 miles of overhead distribution three-phase power line. To address physical resiliency for severe weather events, 11.…
Re-string overhead conductor from WAPA Granite Falls Substation to Marshall Substation. Upgrading from 477 ACSR to AAAC.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the County of Carlton to design, develop, and i…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Minnesota (UMN) to design, evaluate, fabricate, an…