Western Area Power Administration (WAPA), Colorado River Storage Project (CRSP) region proposes new formula rates for the Colorado River Storage Project transmission and ancillary services for CRSP’s costs to be recovered under the Southwest Power Pool’s (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP.
Trenching for underground power cable. Installation of underground electrical equipment, including pad-mounted transformers and grounding/sectional…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the San Rafael Special Services District for th…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the San Rafael Special Services District for re…
Dig 4' trench in existing power utility right of way and install new conduit, wire and transformers.…
Replacing old existing wooden poles with new wood poles along with new hardened conductors, insulators, and down guys. …
This project will work to design, demonstrate, and test a novel process intensified modular system which integrates an electro-catalyst with electr…
Project RELIEF will deploy advanced high-temperature, low-sag (HTLS) conductors on 250 miles of transmission lines, leading to 2x capacity increase…
Construction of new 46kV sub-transmission line for 2 City owned electrical substations. Installation of isolation switches in the 46kV sub-transmis…