Construction related activities for equipment replacement and/or upgrades. This may include pole replacement, traversing unpaved roads, storage of …
BUECI plans to upgrade existing aged switchgear with modern, better weatherized vacuum circuit breakers and protective relays. The new system will …
Install new and improved fault detection devices on existing facilities designed to mitigate sources of wildfire ignition. Replace existing wood po…
Proposed project activities will making several critical infrastructure upgrades in areas prone to frequent outages, including substation upgrades,…
The tribe plans to sub award to their own division of commerce and utilize the 3rd party contractor, Biosafe, to complete the work. They plan to in…
Remove deteriorating wooden solar PV racking that is mounted atop powerhouse roof, thereby eliminating this threat to powerhouse structural failure…
The City of Lakota through Lakota Municipal Utilities will underground approximately 6.26 miles of overhead distribution line. …
Completion of full engineering design of a SCADA system for our electric distribution system and installation of SCADA electronic equipment at two …
This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
Electrical device upgrade and replacement (over-current reclosers and communcation base stations).…