Microgrid-related installation activities.…
Bonneville Power Administration (BPA) proposes installing substation equipment and fiber facilities on the Knight Substation parcel located near th…
Construction and use of distributed energy resources for enhancing system-adaptive capacity during disruptive events with Microgrid and Battery-sto…
Upgrade managed network switches to software defined switches, implement training, and develop a continuous improvement plan.…
PUD No. 1 of Cowlitz plans to replace an overhead distribution feeder from the Vader Substation with a 5.4 underground conductor along SR 506 to th…
The Fluke 7250 pressure controllers are used to measure liquid level and specific gravity in Tanks 7.4 and 8.3, providing data for Nuclear Material…
A coalition of partners across the Rocky Mountain Region will evaluate and model unconventional critical material resources, focusing on key elemen…
This revision will be adding two new testing locations, and a new pole location. These locations include Telegraph Ridge North, and a pole will be …
Petersburg Municipal Power and Light (PMPL) will order and receive Advanced Metering Infrastructure (AMI) meters. Using PMPL staff, AMI meters wil…
Western Area Power Administration (WAPA) will expand the Winner Substation yard to the north, within the existing property boundary to upgrade the …