In July 2025, WAPA completed CX Determination on acquisition of 2.07 acres of additional land abutting the north and east perimeter of Wessington S…
Bonneville Power Administration (BPA) proposes to fund upgrades to the chilled water system and supporting infrastructure at the Nez Perce Tribal H…
Bonneville Power Administration (BPA) proposes to replace insulators and airway lights in kind on transmission line structures along selected locat…
Bonneville Power Administration (BPA) proposes to complete urgent maintenance on the Vantage-Hanford No. 1 transmission line. The work would includ…
Bonneville Power Administration (BPA) proposes to replace a failing culvert in Power Canal Creek with a three-sided concrete bridge. The bridge wou…
Bonneville Power Administration (BPA) proposes to relocate guy wires on two wood pole structures located on the Kalispell-Kerr No. 1 high voltage t…
BPA proposes to cut trees adjacent to the Troy Substation in Lincoln County, Montana. Planned tree cut consists of cutting trees in and near a City…
BPA proposes to perform repairs and improvements at four locations where slopes have failed and are currently preventing equipment access to transm…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
The objectives of this project include four project workstreams: (1) Advanced Monitoring, (2) Steel and Wood Pole with Fire Mesh Upgrades, (3) Micr…