Install a New Colorimeter on the NK-1/3 Raffinate Line CX(s) Applied: B2.2 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 9, 2012Install a New Colorimeter on the NK-1/3 Raffinate Line
CX(s) Applied: B2.2
Date: 02/09/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
One new colorimeter is needed for plutonium (Pu) processing in Phase 2. The colorimeter will determine the Pu concentration in the raffinate line going to H-Canyon.
CX(s) Applied: B2.2
Date: 02/09/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
One new colorimeter is needed for plutonium (Pu) processing in Phase 2. The colorimeter will determine the Pu concentration in the raffinate line going to H-Canyon.