Reactor Upgrade Grant - Rhode Island Atomic Energy Commission CX(s) Applied: B2.2 Date: 11/28/2011 Location(s): Rhode Island Offices(s): Nuclear Energy, Idaho Operations Office
Office of NEPA Policy and Compliance
November 28, 2011Reactor Upgrade Grant - Rhode Island Atomic Energy Commission
CX(s) Applied: B2.2
Date: 11/28/2011
Location(s): Rhode Island
Offices(s): Nuclear Energy, Idaho Operations Office
The objectives of this project are to upgrade the Area Radiation Monitoring System and Confinement Air Handling System I&C with Opto-22 systems, add a Reactor Power Level Trend display that shows power trend data from each of the power level channels, and to replace the Control Rod Magnet Power Supplies and the Control Room Instrumentation Master Switch with new components.
CX(s) Applied: B2.2
Date: 11/28/2011
Location(s): Rhode Island
Offices(s): Nuclear Energy, Idaho Operations Office
The objectives of this project are to upgrade the Area Radiation Monitoring System and Confinement Air Handling System I&C with Opto-22 systems, add a Reactor Power Level Trend display that shows power trend data from each of the power level channels, and to replace the Control Rod Magnet Power Supplies and the Control Room Instrumentation Master Switch with new components.