CX-007626: Categorical Exclusion Determination

Lapeyre Stair Installation CX(s) Applied: B2.5 Date: 01/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

January 24, 2012
Estimated Read Time   min
Lapeyre Stair Installation
CX(s) Applied: B2.5
Date: 01/24/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The existing H-Area platform/control valve ladder located southwest of 281-5H will be replaced with new Lapeyre stairs.