Lapeyre Stair Installation CX(s) Applied: B2.5 Date: 01/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 24, 2012Lapeyre Stair Installation
CX(s) Applied: B2.5
Date: 01/24/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The existing H-Area platform/control valve ladder located southwest of 281-5H will be replaced with new Lapeyre stairs.
CX(s) Applied: B2.5
Date: 01/24/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The existing H-Area platform/control valve ladder located southwest of 281-5H will be replaced with new Lapeyre stairs.