Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission LineCX(s) Applied: B1.3Date: 08/12/2010Location(s): Gray's Harbor County, WashingtonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 12, 2010CX(s) Applied: B1.3
Date: 08/12/2010
Location(s): Gray's Harbor County, Washington
Office(s): Bonneville Power Administration
Replacement of twenty 22-L structures on the Satsop-Aberdeen Number 2 230-kilovolt (kV) transmission line. The project work would involve removal of the existing towers and building replacement towers, replacing insulators, and attaching the existing conductor to the new towers.