CX-002935: Categorical Exclusion Determination

Illinois Accelerator Research Center (IARC)CX(s) Applied: B1.15Date: 06/30/2010Location(s): Batavia, IllinoisOffice(s): Fermi Site Office, Science

Office of NEPA Policy and Compliance

June 30, 2010
Estimated Read Time   min
Illinois Accelerator Research Center (IARC)
CX(s) Applied: B1.15
Date: 06/30/2010
Location(s): Batavia, Illinois
Office(s): Fermi Site Office, Science

The project would erect the Illinois Accelerator Research Center (IARC) building adjacent to and extending north and west of the existing Fermilab (Fermi National Accelerator Laboratory) Collider Detector Facility Building. Associated parking would be constructed adjacent to this new building. The approximately 40,000 square foot IARC building would provide a mixture of office, specialized technical, and educational space.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD