CX-002194: Categorical Exclusion Determination

Install Demonstration Wind Turbine at Weldon Spring, Missouri, SiteCX(s) Applied: B5.1Date: 04/28/2010Location(s): Weldon Spring, MissouriOffice(s): Legacy Management

Office of NEPA Policy and Compliance

April 28, 2010
Estimated Read Time   min
Install Demonstration Wind Turbine at Weldon Spring, Missouri, Site
CX(s) Applied: B5.1
Date: 04/28/2010
Location(s): Weldon Spring, Missouri
Office(s): Legacy Management

The U.S. Department of Energy Office of Legacy Management proposes to install a small (6 to 9 feet [ft] diameter) wind turbine near the Interpretive Center on the Weldon Spring Site. The wind turbine would be pole-mounted with a final height of 20 to 30 feet above the ground surface. The turbine would be considered a small demonstration project to show the public practical home use of wind energy, and it would also correlate with a larger permanent renewable energy display within the Interpretive Center. The wind turbine is expected to produce enough energy to run the lights for the renewable energy display.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD