CX-000976: Categorical Exclusion Determination

Town of Christiansburg Wastewater Treatment Plant Combined Heat and Power from BiogasCX(s) Applied: B1.15, B1.31, B5.1Date: 02/19/2010Location(s): Christiansburg, VirginiaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Lab...

Office of NEPA Policy and Compliance

February 19, 2010
Estimated Read Time   min
Town of Christiansburg Wastewater Treatment Plant Combined Heat and Power from Biogas
CX(s) Applied: B1.15, B1.31, B5.1
Date: 02/19/2010
Location(s): Christiansburg, Virginia
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Install a generator to produce heat and power on a concrete slab adjacent to existing anaerobic digester that produces biogas. Currently the biogas is flared.