Pennsylvania Economic Development Association Sustainable Business Recovery - Albright College Co-Generation FacilityCX(s) Applied: B1.15, B2.2, B5.1Date: 11/09/2010Location(s): Reading, PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy, Na...
Office of NEPA Policy and Compliance
November 9, 2010CX(s) Applied: B1.15, B2.2, B5.1
Date: 11/09/2010
Location(s): Reading, Pennsylvania
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Involves installing a 1.1 megawatt gas engine generator with a waste heat recovery boiler in the existing boiler house. A 15 foot by 25 foot engine room will also be built onto the existing boiler house.