CX-004549: Categorical Exclusion Determination

American Recovery and Reinvestment Act State Energy Program Lampasas Solar Project Phase IICX(s) Applied: B5.1Date: 11/29/2010Location(s): Lampasas, TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

November 29, 2010
Estimated Read Time   min
American Recovery and Reinvestment Act State Energy Program Lampasas Solar Project Phase II
CX(s) Applied: B5.1
Date: 11/29/2010
Location(s): Lampasas, Texas
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The City of Lampasas, Texas plans to install a 309 kilowatt grid-connected solar photovoltaic (PV) system. The solar PV panels would be installed on about 2 acres of a capped, closed landfill. About 1.2 additional acres on that landfill site would be disturbed for improvements to an existing road. The project would also require installation for buried electrical cables and a perimeter fence and lighting.