American Recovery and Reinvestment Act State Energy Program Lampasas Solar Project Phase IICX(s) Applied: B5.1Date: 11/29/2010Location(s): Lampasas, TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
November 29, 2010CX(s) Applied: B5.1
Date: 11/29/2010
Location(s): Lampasas, Texas
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
The City of Lampasas, Texas plans to install a 309 kilowatt grid-connected solar photovoltaic (PV) system. The solar PV panels would be installed on about 2 acres of a capped, closed landfill. About 1.2 additional acres on that landfill site would be disturbed for improvements to an existing road. The project would also require installation for buried electrical cables and a perimeter fence and lighting.