Pinnacle Peak Substation Coupling Capacitor Voltage Transformer InstallationCX(s) Applied: B4.6Date: 05/10/2010Location(s): Maricopa County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
May 10, 2010Pinnacle Peak Substation Coupling Capacitor Voltage Transformer Installation
CX(s) Applied: B4.6
Date: 05/10/2010
Location(s): Maricopa County, Arizona
Office(s): Western Area Power Administration-Desert Southwest Region
Western proposes on installing a new 230-kilovolt coupling capacitor voltage transformer within the fenced area of the Pinnacle Peak Substation. This will also consist of, modifying the existing foundation structure & installing conduit & control cable in a trench to the control building. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system.
CX(s) Applied: B4.6
Date: 05/10/2010
Location(s): Maricopa County, Arizona
Office(s): Western Area Power Administration-Desert Southwest Region
Western proposes on installing a new 230-kilovolt coupling capacitor voltage transformer within the fenced area of the Pinnacle Peak Substation. This will also consist of, modifying the existing foundation structure & installing conduit & control cable in a trench to the control building. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system.