CX-007002: Categorical Exclusion Determination

Install Fencing South of the Receiving Basin for Off-site Fuels (RBOF) to the East Side of 707-HCX(s) Applied: B1.11Date: 09/12/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Sandia Site Office

Office of NEPA Policy and Compliance

September 12, 2011
Estimated Read Time   min
Install Fencing South of the Receiving Basin for Off-site Fuels (RBOF) to the East Side of 707-H
CX(s) Applied: B1.11
Date: 09/12/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Sandia Site Office

Install fencing around the pavement area south of the Receiving Basin for Off-site Fuels (RBOF) to the east side of 707-H. This will provide additional storage space and enhance access to the new Property Protection Area (PPA). Long term plans for Savannah River Remediation are to store radioactive material in this new location to enhance ALARA (as low as reasonably achievable) for employees that travel near the container storage areas presently used within the Tank Farm. Changes will have to be made to the authorization basis for this to take place. The administrative building, 707-H, has many personnel that have to be escorted for access. The new PPA will relieve this requirement.