State Building Energy Improvements - Hammonassett State ParkCX(s) Applied: B1.24, B1.31, B2.5, B5.1Date: 03/31/2010Location(s): Madison, ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
March 31, 2010CX(s) Applied: B1.24, B1.31, B2.5, B5.1
Date: 03/31/2010
Location(s): Madison, Connecticut
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Lighting retrofit and replacement; installation of lighting controls; Heating, ventilation, and air conditioning (HVAC) controls; HVAC equipment replacement; solar hot water system.