Feasibility Study of Brightfield Solar Farm and Design of Municipal Demonstration ProjectCX(s) Applied: A9, B5.1Date: 04/12/2011Location(s): PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
April 12, 2011Feasibility Study of Brightfield Solar Farm and Design of Municipal Demonstration Project
CX(s) Applied: A9, B5.1
Date: 04/12/2011
Location(s): Pennsylvania
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Lower Providence Township of Pennsylvania proposes to use federal funding to install an educational-use solar array outside of the Municipal Complex and perform a feasibility study on the installation of a solar array at the Moyer landfill. The installed solar array at the municipal complex will be a demonstration at 28 kilowatt and will aid in the promotion of solar power throughout the community.