Routine Monitoring, Maintenance, Research, General Site, and Administrative Actions at the Shiprock, New Mexico, Disposal SiteCX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1Date: 04/14/2011Location(s): Shiprock, New MexicoOffice(s): Legacy Management
Office of NEPA Policy and Compliance
April 14, 2011CX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1
Date: 04/14/2011
Location(s): Shiprock, New Mexico
Office(s): Legacy Management
Proposed routine actions include scheduled sampling of groundwater wells and surface water; well development and related activities. General site actions include repair of a sampler in Many Devils Wash; repair of diversion structure, repair of erosion damage in a former borrow pit area; replacement of a damaged culvert; clean out a drain line; various remediation system repairs and upgrades to include repair or replacement of drain line system components; and new work that is needed to characterize groundwater by obtaining 30 soil samples in Many Devils Wash and potentially installing up to 8 monitoring wells.