Advanced Test Reactor Canal AFIP-7 Channel Gap Probe Installation ProjectCX(s) Applied: B3.6Date: 04/19/2011Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office
Office of NEPA Policy and Compliance
April 19, 2011CX(s) Applied: B3.6
Date: 04/19/2011
Location(s): Idaho
Office(s): Nuclear Energy, Idaho Operations Office
This project involves the following primary efforts: ? Installation of the channel gap probe instrument into the East end of the Advanced Test Reactor (ATR) canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables ? Fabrication and installation of a new skimmer bracket ? the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical removal and reconfiguration of skimmer bracket in canal area ? Fabrication and installation of a bubble trap to be mounted on the side of the parapet and used to contain water surface disturbances caused by rising bubbles from the canal level indication system o Metal machining and welding o Physical installation in the canal area