Biodiesel Infrastructure Project (Coulee)CX(s) Applied: A1, A9, B5.1Date: 01/27/2010Location(s): Blair, WisconsinOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
January 27, 2010CX(s) Applied: A1, A9, B5.1
Date: 01/27/2010
Location(s): Blair, Wisconsin
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
The objective is to have public access to Biodiesel-20 and above. The project involves installing 2 new dispenser that can blend bio at the pump. A new card reader will be needed. Tanks and piping can be reused since they were installed in 1998 but some seals in the pump will need to be replaced.