Geothermal Technologies ProgramCX(s) Applied: B3.1, B5.2Date: 12/30/2009Location(s): Casper, WyomingOffice(s): RMOTC
Office of NEPA Policy and Compliance
December 30, 2009Geothermal Technologies Program
CX(s) Applied: B3.1, B5.2
Date: 12/30/2009
Location(s): Casper, Wyoming
Office(s): RMOTC
This is for the laying of 350 foot, 8 inch welded plastic water line from the lower cooling pond at the Tensleep battery to a location between the 5,000 barrel tank and the top pond at the Tensleep battery.