Advanced Formation Evaluation ToolsCX(s) Applied: B3.1, B3.11, B5.2, B5.12Date: 12/10/2010Location(s): Casper, WyomingOffice(s): RMOTC
Office of NEPA Policy and Compliance
December 10, 2010Advanced Formation Evaluation Tools
CX(s) Applied: B3.1, B3.11, B5.2, B5.12
Date: 12/10/2010
Location(s): Casper, Wyoming
Office(s): RMOTC
Drills a 1/2 inch hole through Tensleep with a Logging While Drilling. Work will consist of repeated drilling and logging, more drilling and going back to log the section, multiple times.