CX-016415: Idaho National Laboratory Road Improvements

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 12, 2017
Estimated Read Time   min

The purpose of this revision is to add the following scope: subcontractor permitted rock crushing and hot mix asphalt plants would be located within the Monroe Gravel Pit. The subcontractor would be required to submit copies of their permits into the vendor data system for Idaho National Laboratory (INL) approval. Surveillance and inspections would be conducted by INL to verify subcontractor permit requirements are being met. The Remote-handled Low Level (RH-LLW) Waste Disposal Area project is also using the Monroe Gravel Pit at the present time. Road improvement project personnel have worked with the Facility and Site Services manager in charge of the gravel pit and the RH-LLW project to identify work plans that allow both projects to simultaneously use the Monroe pit without conflict.