Categorical Exclusion Determination
Office of NEPA Policy and Compliance
February 2, 2017Bonneville Power Administration proposes to conduct maintenance activities along powerline road that leads to the Driscoll-Naselle transmission line corridor in the 21/2 mile. Activities include installation of three 18 inch cross drain ditch culverts, one water bar, road surface contouring, and placement of crushed rock road surface.