CX-016684: Zone 11 Interconnect Replacement

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 25, 2017
Estimated Read Time   min

This project would remove and replace the existing 15-kilovolt Zone 11 electrical interconnect due to a weather event in 2015 that caused an arc fault event that resulted in catastrophic damage to the switchgear.